Trades
Contracts built for your trade
Every trade has its own dispute-causing clauses. XOsign knows them — and checks for them when you turn a photo into a contract, in English or Spanish.
Roofing
Roofing contracts live or die on tear-off scope, wood-replacement allowances, warranty transfer, and Florida's hurricane…
View the tradeDrywall
Drywall disputes almost always trace to one missing line: the finish level. A contract that doesn't specify Level 1-5 pe…
View the tradePainting
Painting contracts fall apart on surface prep, product spec, and number of coats. 'Paint the house' is not a scope — it'…
View the tradeFraming
Framing contracts hinge on lumber grade, stud spacing, engineered-wood specs, and — in Florida — hurricane connectors. M…
View the tradeHVAC
HVAC contracts turn on AHRI matching, refrigerant disclosure, and ductwork scope. With the R-410A phase-out and R-454B t…
View the tradePlumbing
Plumbing contracts go wrong on fixture spec, pipe material, and access/finish-repair scope. PEX vs. copper is not a deta…
View the tradeElectrical
Electrical contracts need outlet counts and locations, service-upgrade scope, and inspection coordination nailed down. '…
View the tradeMillwork & Cabinetry
Millwork's #1 dispute is material spec — particleboard sold as 'wood.' Cabinetry contracts also need finish spec, a hard…
View the tradeHandyman
In Florida, the handyman license-exempt threshold is $1,000 (Fla. Stat. §489.103(9)). A handyman contract has to keep to…
View the tradeConcrete & Shell
Concrete contracts need PSI, reinforcement spec, and pour-day weather contingency. In Florida shell work, add HVHZ wind-…
View the trade